Spawning Bed Rehabilitation

Meshaw Falls Spawning Bed Project

Removed debris, dislodged rocks and gravel, and clean algae using fire pumps

Used a silt net for downstream side

12 participants for a total of 60 volunteer hours

 

 

 

Beaver Dam Removal Project Lower Sturgeon Turenne Road

Equipment:  small excavator, bobcat loader, barge and dump truck

Removed dam debris, cleaned spawning site above dam, hauled debris to landfill

Used a silt net for downstream side

8 participants for a total of 64 volunteer hours

 

 

Lower Sturgeon Spawning Bed Project

Removed debris, dislodged rocks and gravel, and clean algae using fire pumps

Used a silt net for downstream side

6 participants for a total of 30 volunteer hours